9.30.2011

Coming Together

Progress has been a little slow lately with the bathroom but I think we're starting to see the light at the end of the tunnel. Seems like they get going and things are great for like a week and then everything stops again.

what a mess!
Last week most of the drywall/green board was finished and the shower pan installed. This week the rest of the green board was installed in the shower and today the shower and tub surrounds went in. Ainsley made me laugh the other day because she thought the color on the walls around the bathtub was the color we chose to paint the bathroom! When she found out that was the green board and that it would be covered, she suggested we find that color at Lowe's because it looked nice=)

Here are a few samples we did like...not all of them are in the running but since they come in 3's they're included! I think picking out paint is soooooo difficult! ***Would love to know your selection...give it a number 1-18 (1 being the first one on the left and so on!)***bathroom door and vanity area (with tub propped against the wall)


the shower surround without light and with light


the tub surround

next stop is tile, vanity and cabinet installation and then lighting and accents! we'll keep you posted!